Skip to main navigationSkip to main content

TCC-1400 Handles Tight Job Site With Unmatched Versatility

Oct 16, 2026 - 3 hours ago

A Link-Belt TCC-1400 telecrawler assisted work at the Dexter Dam reservoir near Eugene, Oregon.

TCC-1400 Handles Tight Job Site With Unmatched


TCC-1400 Handles Tight Job Site With Unmatched
Triad Machinery of Portland, Oregon, supplied and managed the machine. Triad Territory Managed Burl Redman said the TCC-1400 was perfect for its pick and carry abilities.

TCC-1400 Handles Tight Job Site With Unmatched
“Pick and carry was important to this job and why we went with the TCC versus an RT crane,” Redman said.
He added that the TCC-1400’s hydraulic boom increased its versatility tenfold and allowed for flexible job site operations.


“The TCC has a hydraulic boom, not a lattice boom, allowing for short or long boom lifting. This was a tight job site. If you have 100 or 200 feet of boom, it can be harder to move around,” Redman said. “With a short boom, you don’t have as much of that pendulum.”

TCC-1400 Handles Tight Job Site With Unmatched
The TCC-1400’s versatile boom configurations and pick and carry functionality ultimately made the difference.
“A big reason the TCC was right for this job was the convenience with the ability to use a short boom,” Redman said. “Pick and carry and short and long boom capacities were both important for this job.”


Source: Link-Belt



Share Article

News Archive

Subscribe to the Supply Post Print Edition

Supply Post Cover - Liebherr A 918: Compact & Capable - October 2026

Receive 12 issues per year delivered right to your door. Anywhere in Canada or USA.

Subscribe

Subscribe

Free

to the Supply Post E-News

Subscribe to the Supply Post E-News and receive the Supply Post Digital Edition monthly FREE to your inbox!

Subscribe

Read

Free

the Digital Edition

Supply Post Cover - Liebherr A 918: Compact & Capable - October 2026
Supply Post Cover - Liebherr A 918: Compact & Capable - October 2026

Free

Read the Digital Edition

Please wait...